Skip to main content

Filling and Discharging of Rail Tank-Wagons

Four Checklists to Avoid Leaks with Liquids

Introduction

As the most frequent cause of leaks is incorrect filling or discharge processes, the main aim behind standardised checklists is to avoid leaks from tank-wagons for liquids by means of correct and professional handling on the part of operating staff working for fillers and unloaders (note: tank-wagons for pressurised gases or solids are not dealt with here). They include the necessary steps (checkpoints) in the procedure to ensure leaktightness in the appropriate sequence which normally have to be observed when filling or emptying liquids into or from tank-wagons. They may need to be supplemented by the user for other specific operational steps/procedures (operating instructions).

Depending on the product and specification of the tank and fittings, tank-wagons may:

  • Be filled from the bottom through the bottom valve in conjunction with the external shut-off device (discharge valve, dry coupling) or from the top through the filling pipe or dome cover;
  • Be discharged through the bottom shut-off device (discharge valve, dry coupling) or from the top through an attached dip tube.

Four checklists have therefore been developed, covering respectively top filling, top discharge, bottom filling and bottom discharge. They are a chronological sequence of the steps necessary for the filling and discharge of tank-wagons. Using them as an aid, users can be sure that they have followed them fully in the correct sequence. If one of the steps cannot be carried out properly, the filling or discharge process is interrupted or stopped until the discrepancy/fault is rectified. This should enable errors and unsafe situations to be recognised in advance and avoided.

The filler and unloader are the undertakings that fill dangerous goods into tanks (e.g. tank-wagons) or discharge (unload) them. The legal obligations of these entities include:

  • Checking that all closures are in a closed position once the tank has been filled, and that there is no leakage (see obligations of “filler” in RID 1.4.3.3 (RID = Regulations concerning the International Carriage of Dangerous Goods by Rail));
  • Ensuring after the tank has been unloaded that the valves and inspection openings are closed (see obligations of “unloader” in RID 1.4.3.7.1).

The original German version of the checklists can be found on
https://www.vci.de/Services/Leitfaeden/Seiten/Kesselwagen-fuer-Fluessigkeiten.aspx

Disclaimer

This document is intended for information only and is provided in good faith. While it is accurate as far as the authors are aware, no representations or warranties are made about its completeness. Therefore no responsibility will be assumed in relation to the contents of this document.

Acknowledgements

The checklists have been developed jointly by:

  • Verband der Chemischen Industrie e.V. (German Chemical Industry Association) (VCI)
  • Mineralölwirtschaftsverband e.V. (Association of the German Petroleum Industry) (MWV)
  • Unabhängiger Tanklagerverband e.V. (Independent Tank Storage Association) (UTV)
  • Vereinigung der Privatgüterwagen-Interessenten (Association of Private Goods Wagon Users) (VPI)

The translation of the original German version into English has been made by the Intergovernmental Organisation for International Carriage by Rail (OTIF).

May 2012

Top Filling

Points relevant to leaktightness for filling rail tank-wagons (top filling) for liquids (for inclusion in checklists) – with explanations/examples

As on: May 7th, 2012

1. Before Filling

CheckExplanationok
1.1*Tank and equipment in technically faultless condition (visual inspection from the ground).
Before clearance for filling, the tank and its items of equipment must be checked to ensure that they are in conformity with RID.
1.21Bottom valve (internal stop-valve) closed and secured against unintentional opening, no leakages visible (visual inspection).
The shut-off devices (valves) must clearly indicate whether the valve position is “open” or “closed”. There must be no leakage, i.e. there must be no drips on the valves. If drips are found, further measures are necessary. This also applies to observing the closure sequence in accordance with RID when discharging residues.
1.3*Discharge valve (external stop-valve) closed (on opposite side also), no leakages visible (visual inspection).
External shut-off devices must be checked manually or with a suitable tool to ensure that they are closed. Any safety devices to protect against unintentional opening must be used if available. There must be no leakage, i.e. there must be no drips on the valves. If drips are found, further measures are necessary. This also applies to the closure sequence in accordance with RID when discharging residues.
1.4*Closing device (e.g. screw thread, blank flange) closed on both sides.
There must be no leakage, i.e. there must be no drips on the outlets. If drips are found, further suitable measures are necessary. To close the cap, only a suitable tool may be used, with which the necessary force is generated by means of even leverage and damage to the sealing elements is avoided.
1.5Check dome cover/dome cover sealing and other operational openings in the dome area for visually faultless condition. Visual inspection: if the dome is not opened during filling (e.g. chemical dome cover) and shows no sign of leakage and if the threads are in a proper condition, there is no need to open the dome cover to check the seals.
Torn or otherwise damaged dome cover seals must be replaced.

2. During Filling

CheckExplanationok
2.1Degree of filling observed.
2.2Supervise filling procedure.

[Points 1.1 to 1.4 may also be carried out upon arrival at the facilities (arrival check) rather than directly before filling.]

Points relevant to leaktightness for emptying rail tank-wagons (top discharge) for liquids (for inclusion in checklists) – with explanations/examples

As on: May 7th, 2012

1. Before Unloading

CheckExplanationok
1.1Closing device (e.g. screw thread, blank flange) closed both sides.
1.2Tank and items of equipment closed in such a way that nothing can escape uncontrolled.
1.3No damage to tank and items of equipment (no danger for unloading procedure) ascertained.
Notify damaged tanks and items of equipment/do not clear for transport.
1.4Before opening the closing device (e.g. dome cover, blank flange) check that it is leaktight.
1.5Closing device (e.g. dome cover, blank flange) opened, discharge device connected.
To open closing devices, only use suitable tool, with which the necessary force is generated by means of even leverage and damage to the sealing elements is avoided.
1.6Internal and external stop-valves opened.
Opening sequence according to instructions.

2. During Unloading

CheckExplanationok
2.1No damage to tank and items of equipment (no danger for unloading procedure) ascertained.
Notify damaged tanks and items of equipment/do not clear for transport.

3. After Unloading

CheckExplanationok
3.1Check whether tank emptied.
Suitable measures are, e.g., sight glass or use flow meters in the discharge device pipes, weighing, change in pump noise, product no longer carried.
3.2Operational openings (e.g. dome cover, pressure pipe, inspection openings, dip tube) closed and leaktight (visual inspection).
3.3Outside of tank free of dangerous residues.
3.4Handover report is signed/clearance.
The proper condition is documented. Effectiveness check is carried out on a random basis and is documented.

Points relevant to leaktightness for filling rail tank-wagons (bottom filling) for liquids (for inclusion in checklists) – with explanations/examples

As on: May 7th, 2012

1. Before Filling

CheckExplanationok
1.1*Tank and equipment in technically faultless condition (visual inspection from the ground).
Before clearance for filling, the tank and its items of equipment must be checked to ensure that they are in conformity with RID.
1.22Discharge valve (external stop-valve) closed (on opposite side also), no leakages visible (visual inspection).
External shut-off devices and fittings must be checked manually or with a suitable tool to ensure that they are closed. Any safety devices to protect against unintentional opening must be used if available. There must be no leakage, i.e., there must be no drips on the valves. If drips are found, further measures are necessary. This also applies to the closure sequence in accordance with RID when discharging residues.
1.3Filling device attached and internal and external stop-valve on the filling side open; closing device on opposite side closed.
The specific operating instructions for filling must be observed.

2. During Filling

CheckExplanationok
2.1Degree of filling observed.
2.2Supervise filling procedure.

[Points 1.1 and 1.2 may also be carried out upon arrival at the facilities (arrival check) rather than directly before filling.]

Points relevant to leaktightness for emptying rail tank-wagons (bottom discharge) for liquids (for inclusion in checklists) – with explanations/examples

As on: May 7th, 2012

1. Before Unloading

CheckExplanationok
1.1Closing device (e.g. screw thread, blank flange) closed both sides.
1.2Tank and items of equipment closed in such a way that nothing can escape uncontrolled.
1.3No damage to tank and items of equipment (no danger for unloading procedure) ascertained.
Notify damaged tanks and items of equipment/do not clear for transport.
1.4Before opening the closing device (e.g. screw thread, blank flange) check that it is leaktight.
1.5Closing device (e.g. screw thread, blank flange) opened, discharge device connected.
To open cap and release handwheels for the discharge valves, only use suitable tool, with which the necessary force is generated by means of even leverage and damage to the sealing elements is avoided.
1.6Internal and external stop-valves opened.
Opening sequence according to instructions.

2. During Unloading

CheckExplanationok
2.1No damage to tank and items of equipment (no danger for unloading procedure) ascertained.
Notify damaged tanks and items of equipment/do not clear for transport.

3. After Unloading

CheckExplanationok
3.1Check whether tank is empty, discharge device empty (visual inspection or other suitable measure).
Other suitable measures are, e.g., sight glass or use flow meters in the discharge device pipes, weighing, change in pump noise, product no longer carried.
3.2Bottom valve (internal stop-valve) closed and secured (visual inspection).
Lever position closed. Closing sequence observed (from inside to outside), internal and external shut-off and closing devices are closed in accordance with the operating instructions. The bottom valve is in a recognisably closed position and secured against unintentional opening.
3.3Closing device (e.g. screw thread, blank flange) opened.
3.4Closing device (e.g. screw thread, blank flange) correctly mounted (seals present and checked), closed with suitable tool and leaktight on both sides (visual inspection).
3.5Operational openings (e.g. vapour return pipe) closed and leaktight of (visual inspection).
3.6Outside of tank free of dangerous residues.
3.7Handover report is signed/clearance issued.
The proper condition is documented. Effectiveness check is carried out on a random basis and is documented.

Image